ENVIROTUBES  Geotextile Tubes for Dewatering Dredged Materials and Sludge Spanish Portuguese French
Envirotubes.com
About ENVIROTUBES
Frequently Asked Questions
Installation Recommendations
Capacity Chart
Material Analysis and Testing
ENVIROTUBE Technical Data
Geotextile Specifications
Photo Gallery
Case Studies
Request for Quote
Glossary of Terms
DINO Six Dredge
Contact Us
Apply for Credit
Dean Wickoren
ENVIROTUBE Technical Director
Industrial Fabrics, Inc.

dean@envirotubes.com
913-221-5345 (mobile)

Resume and Accomplishments (over 40 years experience)

Frequently Asked Questions

Downloads

ENVIROTUBE Brochure

Capacity Chart

Product Data Sheet 4X6

Project Questionnaire

Hanging Bag Test

Industry News

International Dredging Review
The geotube phenomenon

The Press of Atlantic City
A Line in the Sand. A.C.'s beach 'geotube' hold up to destructive waves.

GFR Engineering Solutions
Hold the ketchup!

Erosion Control Magazine
Geotextile Tubes Provide Coastal Erosion Protection in Ecuador.

Installation Recommendations

Filling Tubes with Sand

When filling an ENVIROTUBE with sand, one fill port is left open to allow the water out of the top of the tube (usually at the opposite end from the fill point). The elevation of this port can be extended to help shape the ENVIROTUBE. The sand entering the tube will form a delta, eventually filling the entire tube. The tube only has to be filled or pumped once. When the tube dewaters there will be very little or no further settling. Special care has to be taken at the filling port to insure a level top with no void at the fill point.

For best results, filling of the ENVIROTUBE should be non-stop. A good slurry mix to pump into the tube is 10% - 15% sand and 85% - 90% water. The water is needed to disperse the sand and carry it down the tube. Fill ports should be spaced every 25-50 feet.

The pressure in the tube can be monitored with a gauge, stand pipe or measure the elevation or height of the tube. Water must be allowed to exit the tube through one or more fill ports while the tube is being filled with sand to control the elevation and the internal pressure. All of the water will not pass through the fabric to exit the tube.

The tube can be filled by a dredge, a pump suspended in a borrow pit, or from a flooded hopper being loaded with an excavator or bucket loader.

A normal fill rate would be 60 - 150 CY per hour. A normal slurry flow rate would be from 1500 - 2500 US gallons per minute.

Filling ENVIROTUBES with fine grain materials for constructing spoil areas on a dredge job

When filling with fine grain materials, all of the ports should be closed to allow the water to exit through the fabric. A polymer has to be used to get a good dewatering function. The ENVIROTUBE must be filled or pumped several times; even then some final settling must be allowed for.

If the fine grain material is allowed to get very dry, cracking will occur (like a ND swamp in August). In dewatering, cracking is desirable; it helps with the drying. The tube can be covered to prevent re-saturation with rainwater, etc.

If the ENVIROTUBE is subjected to pounding surf or severe wake, precautions must be taken to prevent the fill material from being pounded out through the fabric. This can be done by lining the tube with nonwoven fabric. The anchor tubes on the scour aprons are always lined with a nonwoven fabric.

ENVIROTUBE Placement

ENVIROTUBES must be butted against each other for a continuous installation. The tube to be placed is tucked against the filled tube and enough slack is pulled to allow the new tube to form to the shape of the filled tube. This will make a very tight joint. ENVIROTUBES are sewn with handles so the tube can be tied in place to insure proper slack for making the joint.

One tube should never be filled over the end of the next tube to be filled. THe second tube will lift the first tube hydraulically, making a very uneven, ugly, leaking joint.

ENVIROTUBES can be stacked in a pyramid fashion: two on the bottom, and one on top or three on the bottom and two on top, etc. Care must be taken when placing tubes.

Site Preparation

Proper site preparation is a must. There are two major things to address. The tubes love to roll. They must be restrained and level. When installed out of the water, the decant water must be controlled to prevent erosion. You do not have to worry about the water coming out of the bottom of the tube because the bottom fabric plugs right away and the water comes out of the top, upper sides and the open fill port.


Note the scour apron beneath the ENVIROTUBE for foundation support and erosion protection.

Scour Aprons

If the tube will be exposed to moving water or water pressure of any kind, an apron will be needed to prevent scouring under the tube. If the exposure is only on one side, the apron only has to be on one side.

The scour apron will have an anchor tube sewn into the outer edge. This will be filled like the tube and must extend out past the edge of the tube at least half the width of the tube. Moving water will scour under this anchor tube. It will fall on the hole and protect the large tube from scour.

Covering

There are many ways of covering the tubes, depending on what the top has to be. For a dune, the cover can be sand and vegetation. If a road is needed on top, multiple tubes must make up the top and be covered with earth or a concrete mat.