ENVIROTUBES  Geotextile Tubes for Dewatering Dredged Materials and Sludge Spanish Portuguese French
Envirotubes.com
About ENVIROTUBES
Frequently Asked Questions
Installation Recommendations
Capacity Chart
Material Analysis and Testing
ENVIROTUBE Technical Data
Geotextile Specifications
Photo Gallery
Case Studies
Request for Quote
Glossary of Terms
DINO Six Dredge
Contact Us
Apply for Credit
Dean Wickoren
ENVIROTUBE Technical Director
Industrial Fabrics, Inc.

dean@envirotubes.com
913-221-5345 (mobile)

Resume and Accomplishments (over 40 years experience)

Frequently Asked Questions

Downloads

ENVIROTUBE Brochure

Capacity Chart

Product Data Sheet 4X6

Project Questionnaire

Hanging Bag Test

Industry News

International Dredging Review
The geotube phenomenon

The Press of Atlantic City
A Line in the Sand. A.C.'s beach 'geotube' hold up to destructive waves.

GFR Engineering Solutions
Hold the ketchup!

Erosion Control Magazine
Geotextile Tubes Provide Coastal Erosion Protection in Ecuador.

Case Studies

Louisville Gas & Electric Company Sludge Ponds Overflow

The Louisville Gas & Electric Company is a coal burning power generating plant near Louisville, Kentucky. They had a problem in which the sludge ponds that settled out the scrubbings from the chimney were full and overflowing onto the road.

The Problem

The sludge, which consisted mostly of lime and gypsum, was being cleaned from the ponds with a long reach excavator, spread out to dry, and hauled to a landfill. This process was not keeping up with the input rate of solids, the excavator was too slow and there was not enough room to dry the sludge. The sludge could not be land-filled without dewatering. If something was not done the plant would have to shut down.

The Solution

Working together with Midwest Dredge, we did a test, pumping with dredge into a 30 ft. circumference x 50 ft. long tube. The test went well and the plant hired Midwest Dredge to pump the sludge from the ponds to the tubes for dewatering. By the end of the first full day of pumping the plant was out of trouble. The project engineer informed us that the whole clean up was costing much less than he had anticipated. All three ponds were emptied into the tubes, dewatered and hauled to the landfill without a mishap. The tubes were 30 ft. circumference x 200 ft. long made of Propex® Geotex® 4x6 geotextile fabric. Each tube was pumped several times as it dewatered, and where stacked on top of each other to conserve space.

Louisville, Kentucky Case Study (PDF)