ENVIROTUBES  Geotextile Tubes for Dewatering Dredged Materials and Sludge Spanish Portuguese French
Envirotubes.com
About ENVIROTUBES
Frequently Asked Questions
Installation Recommendations
Capacity Chart
Material Analysis and Testing
ENVIROTUBE Technical Data
Geotextile Specifications
Photo Gallery
Case Studies
Request for Quote
Glossary of Terms
DINO Six Dredge
Contact Us
Apply for Credit
Dean Wickoren
ENVIROTUBE Technical Director
Industrial Fabrics, Inc.

dean@envirotubes.com
913-221-5345 (mobile)

Resume and Accomplishments (over 40 years experience)

Frequently Asked Questions

Downloads

ENVIROTUBE Brochure

Capacity Chart

Product Data Sheet 4X6

Project Questionnaire

Hanging Bag Test

Industry News

International Dredging Review
The geotube phenomenon

The Press of Atlantic City
A Line in the Sand. A.C.'s beach 'geotube' hold up to destructive waves.

GFR Engineering Solutions
Hold the ketchup!

Erosion Control Magazine
Geotextile Tubes Provide Coastal Erosion Protection in Ecuador.

Material Analysis and Testing

Items Required for testing
1 ENVIROTUBE hanging bag
10 quart pail with heavy handle
5 gallon bucket

This test is designed to determine the final capacity of the ENVIROTUBES by measuring the shrinkage factor of the material to be dredged.

To gather samples, we recommend a standard 10 quart pail. Remove the wire handle and replace it with a longer handle made of a much heavier material, such as rebar of 1/4 x 1 flat bar bolted to the pail to keep the handle rigid upright (bend into an arch so that it is approximately 12 inches high). Drill four 1/4 inch holes in the bottom of the pail. Tie a rope to the handle and throw it out into a pond or lake in the area where you want to dredge (You may want to sample more than one area to get an average).

The heavy handle will tip the pail bottom up, the holes in the bottom will let the air out and the pail will sink, and the heavy handle will sink in the mud or sludge. Pull the pail in. The holes in the bottom will let the water out and the pail will fill with in situ mud. Dump the sample pail into a five gallon bucket. Repeat the process until the five gallon bucket is full. Dump three full five gallon buckets into the hanging bag. The hanging bag can be suspended by the handles or sit on the ground using the handles to hold it up.

Allow the material to dewater and shrink. This takes a few hours or a few days, depending on the material and how dry you want it. When the material has dried to the desired consistency, dump it back into the five gallon pails; it will often fit into one pail. This gives you the shrink rate of the material so that the quantity of tubes may be estimated.

Because the material will always shrink after the last pumping, the full capacity of the tube cannot be used for the estimate. The tube must be pumped several times. Each time it is pumped and the material shrinks, the tube will be fuller and it will take less time to fill it to full height again.

Example: A 45' circumference tube will hold 4 y² per linear foot at full height. Filled with a material that has a 50% shrink factor, the tube would hold 8 y² per linear foot at full height. Because of the final shrinkage, 100% of the capacity cannot be used as an estimate. A final capacity of 7 y² per linear foot would be a better estimate.